Every single member from our large efficiency revenue team values customers' wants and company communication for. We are able to do your tailored get to fulfill your own satisfactory! Our organization sets up several departments, including manufacturing department, sales department, high quality control department and sevice center, etc.
Specification | |
---|---|
Faucet Type | Bathroom Sink Faucets, |
Installation Type | Centerset, |
Installation Holes | One Hole, |
Number of Handles | Single Handle, |
Finish | Ti-PVD, |
Style | Country, |
Flow Rate | 1.5 GPM (5.7 L/min) max, |
Valve Type | Ceramic Valve, |
Cold and Hot Switch | Yes, |
Dimensions | |
Overall Height | 240 mm ( 9.5 " ), |
Spout Height | 155 mm ( 6.1 " ), |
Spout Length | 160 mm ( 6.3 " ), |
Faucet center | Single Hole, |
Material | |
Faucet Body Material | Brass, |
Faucet Spout Material | Brass, |
Faucet Handle Material | Brass, |
Accessories Information | |
Valve included | Yes, |
Drain included | No, |
Weights | |
Net Weight (kg) | 0.99, |
Shipping Weight (kg) | 1.17, |
Overall Machine | Model | FJ-802 | |
Type | Crawler type | ||
Overall dimension (L * w * h) | mm | 3550*1700*2650 | |
Long wheelbase or track ground | mm | 1450 | |
Wheelbase (front / rear) | mm | 1200 | |
Minimum ground clearance | mm | 410 | |
Minimum service quality | kg | 2650 | |
Ground specific pressure of track | kPa | 32 | |
Connection mode of engine and clutch | Direct connection | ||
Starting mode | Electric start | ||
Power output shaft power | kW | ≥49.98 | |
Maximum traction | kN | ≥20.0 | |
Safety belt | Model | FS2001 | |
Fuel tank | Type | HB01-DDB | |
Volume L | 60 | ||
Steering system | Steering system type | Planetary differential steering |
|
Steering gear type | Screw nut circulating ball |
||
Hydraulic steering | Normal working pressure | MPa | 20 |
Maximum pressure marked on the hydraulic hose | MPa | 35 | |
Burst pressure of hydraulic hose | MPa | 80 | |
Braking system | Service brake system type | Wet friction plate | |
Parking brake system type | Wet friction plate | ||
Safety starting device | Model | Clutch release start | |
Engine | Type | In line, four stroke, water cooled |
|
Model | YD4EZ80C1 | ||
Intake method | Turbo | ||
Number of cylinders | 4 | ||
Bore * Stroke | mm | φ105*118 | |
Nominal power | kw | 58.8 | |
Type approved rated net power | kw | 58.8 | |
Calibration speed | r/min | 2400 | |
Cooling mode | water-cooling | ||
Exhaust pipe | Size of anechoic chamber (diameter * length) |
mm | φ132*600 |
Weight of muffler (including anechoic chamber) |
kg | 9.5 |
It is the gold supplier of ali website, the transaction is guaranteed.Our agricultural machinery products complete, and support a variety of trading, delivery cycle faster, is a comprehensive strength of the trading company.It is located in yancheng, jiangsu province, with a superior geographical position.Agricultural machinery products sold by our company have passed iso9001:2000 international quality management system certification, our company always adhere to the "unity, determination, realistic, innovation" spirit of enterprise, strict quality, and strive to become a high-quality product.It always puts customer demand in the first place, excellent product performance, good after-sales service, reasonable product price for the company to win a broad market, the products are exported to Russia, Brazil, Argentina, Australia, Singapore, New Zealand and many other countries.
It not only provides convenient one-stop service for the majority of customers, but also pays more attention to scientific and technological innovation, management innovation and staff quality improvement.
SHIPPING(Normally arrive port time in working days) | ||||
Destination | Express/Courier | Ship by sea | Ship by air | Ship by EMS |
DHL/FedEx/UPS/SF | ||||
North America | 3-7 days | 15-24 days | 5-7 days | 10-12 days |
South America | 3-7 days | 15-25 days | 5-7 days | 10-12 days |
European Countries | 3-7 days | 20-30 days | 5-7 days | 10-12 days |
Africa Countries | 3-7 days | 40-50 days | 5-7 days | 10-12 days |
The Middle East | 3-7 days | 15-25 days | 5-7 days | 10-12 days |
Australia | 3-7 days | 10-15 days | 5-7 days | 10-12 days |